BOM Sync

Automatically inserts the BOM from EPDM on the SOLIDWORKS drawing

If you want to put the PDM BOM on a SOLIDWORKS drawing instead of the CAD one, the Cadmes BOM Sync will do the trick. With a simple click users can insert the BOM from SOLIDWORKS Enterprise PDM.

Features: 
  • Adds position number functionality to the computed BOM in Enterprise PDM. This can be very important in conjunction with ERP
  • The drawing contains the same BOM as is managed in PDM, saving work and preventing mistakes
  • Improved BOM readability because of sorting options
  • Easy to maintain by internal administrator

In some cases it is preferable to insert the PDM BOM on the SOLIDWORKS drawing. With the PDM BOM to Drawing Add-On it is possible do so. In addition to that it enables users to create position numbers in PDM for computed BOM with option to keep the numbers to the same BOM lines after changes. This is usually very important when a connected ERP system also uses position numbers and the company wants to keep those consistent with the numbers on drawing.

The add-in also includes mechanism to sort the BOM automatically based on one of the containing columns and update the balloon numbers.

The PDM BOM to Drawing add-in has a large number of configurable preferences that can be managed by an administrator.